Switch an assigned member in a project with another

Project>   “Settings” icon in the top right corner of the window. Go to the “Collaboration on project” section.

Select the member to be replaced by checking the box on its left.

Select the member you want to replace in the settings project.

Click on the “Replace” button Replace button to switch members on a project. located above the list of project members.

A pop-up window appears, you can then choose:

  • Which member to replace the initial member with
  • A start date for the replacement. All tasks scheduled from this date will be affected by the change of assignment.

Replace a member with another member on a project.

Validate the replacement and note, in the Who view of the project, that the change of member has been carried out on all the planned tasks, from the chosen date.